Part A:

1.Plan geotechnical site investigations for Twin M2 Motorway Bridges over Boxley Road as shown in figures below.

Task 1:

Carryout desk study for the site and find required information about the project, determine the quality and uniformity of the soil at the site. In addition determine the depth of the bedrock. (15 marks) Task 2: Based on information obtained in task 1 plan site investigations for the project. (20 marks) (i) Number of boreholes/test pits and their depths and locations (ii) The in-situ tests and their depths. (iii) Type of samples collection and their depths