Quiz
________________________________________
Question 1 (1 point)
Process capability calculations make little sense if the
process:
Question 1 options:
-data were taken over a period of time
-is not in statistical control
-variations are due to special causes
-has control but is not capable
Save
Question 2 (1 point)
In a variable sample size situation–such as when the number
of units produced varies–if the sample size in a p-chart increases from 100 to
120, the upper and lower control limits will:
Question 2 options:
-move farther apart
-move closer together
-remain the same distance apart
-both shift upward
Save
Question 3 (1 point)
Twenty samples of size 6 were collected for a variable
measurement. Determine the upper control limit (UCL) and lower control limit
(LCL) for an R-chart if the sum of the sample ranges equals 88.0.
Question 3 options:
UCL = 8.8176, LCL = 0.0000
UCL = 9.3016, LCL = 0.3344
UCL = 13.2000, LCL = 0.0000
UCL = 29.3921, LCL = 0.0000
Save
Question 4 (1 point)
A(n) _____ is a performance characteristic that is either
present or absent in the product or service under consideration.
Question 4 options:
-variable
-control limit
-attribute
-performance range
Save
Question 5 (1 point)
Control limits relate to _____, while specification limits
relate to individual measurements.
Question 5 options:
-values within the upper and lower control limits
-total values in the range
-median values
-averages of samples
Save
Question 6 (1 point)
An alternative to using the R-chart is the:
Question 6 options:
np-chart
s-chart
c-chart
p-chart
Save
Question 7 (1 point)
The sample size for an x-chart:
Question 7 options:
-should be greater than or equal to 30
-is larger than that for an Xbar-chart
-is equal to one
-depends on the number of measurements taken
Save
Question 8 (1 point)
Which of the following is NOT an indication of an
out-of-control process?
Question 8 options:
-Five consecutive points fall on one side of the center line
-Four of five consecutive points fall within the outer
two-thirds region between the center line and one of the control limits
-Two of three consecutive points fall in the outer one-third
region between the center line and one of the control limits
-A single point falls above the upper control limit
Save
Question 9 (1 point)
A precision parts manufacturer produces bolts for use in
military aircraft. The specifications for bolt length are 37.50 ΓΒ± 0.25 cm. The
company has established an Xbar-chart and an R-chart using samples of size
five. The centerlines for the Xbar-chart and R-chart are set at 37.65 cm and
1.03 cm, respectively. What is the value of Cpk for this process?
Question 9 options:
0.08
0.28
0.75
0.03
Save
Question 10 (1 point)
Short repeated patterns in a control chart, with alternating
high peaks and low valleys, are known as:
Question 10 options:
-trends
-cycles
-spikes
-reciprocals
Save
Question 11 (1 point)
Which of the following pairs of charts are used together?
Question 11 options:
Xbar-chart and p-chart
R-chart and p-chart
R-chart and s-chart
Xbar-chart and R-chart
Save
Question 12 (1 point)
In pre-control, which zone covers the nominal dimension?
Question 12 options:
-Gray zone
-Yellow zone
-Red zone
-Green zone
Save
Question 13 (1 point)
Statistical process control relies on _____.
Question 13 options:
-capability models
-variance analyses
-control charts
-conformance reports
Save
Question 14 (1 point)
Which of the following charts is used to monitor the total
number of defects per unit when a constant subgroup size is employed?
Question 14 options:
s-chart
c-chart
p-chart
u-chart
Save
Question 15 (1 point)
Collecting _____ data is usually easier than collecting
_____ data because the assessment can usually be done more quickly by a simple
inspection or count.
Question 15 options:
-attribute; variable
-concrete; continuous
-random; discrete
-simple; continuous
Save
________________________________________
Question 16 (1 point)
When using a control chart — one rule of thumb is to have a
minimum of 25 data points–preferable 40 or more.
Question 16 options:
True
False
Save
Question 17 (1 point)
When the R-chart is not in control (has a signal), you
should not investigate signals found in the related Xbar chart.
Question 17 options:
True
False
Save
Question 18 (1 point)
Before control charts can be used to identify the presence
of special causes on line, the process must be brought into a state of
statistical control; that is, the data used to establish the charts and define
the control limits must be subject only to a constant system of common causes.
Question 18 options:
True
False
Save
Question 19 (1 point)
A scatter diagram can help identify possible relationship
patterns and the dispersion around those patterns
Question 19 options:
True
False
Save
Question 20 (1 point)
A flow chart can help document the product stream (rational
ample) associated with the data plotted in a control chart.
Question 20 options:
True
False
Save
________________________________________
π¦πΊ Writing for Australian Universities
- AGLC4 (law), APA 7th, Harvard (Business), Vancouver (Health Sciences)
- Grading: HD (85-100%), D (75-84%), C (65-74%), P (50-64%)
- UniMelb, UNSW, ANU, Monash, UQ, UWA standards covered
- Australia uses British English spelling conventions
- Turnitin is widely used β all work is checked before delivery
Australia Pricing Guide
How It Works β 3 Simple Steps
Fill In Your Order Form
Provide your topic, academic level, deadline, referencing style, and any specific instructions or rubric criteria.
Get Matched with a Writer
We assign the best-qualified expert in your subject, familiar with Australia university requirements.
Receive & Review
Download your plagiarism-free paper, review it, and request any free revisions within 14 days if needed.
Frequently Asked Questions
Is this service plagiarism-free?
Yes. Every paper is written from scratch by a human expert to your specific instructions. We run all papers through professional plagiarism detection software and can include a Turnitin-equivalent report on request.
Do your writers know Australia academic standards?
Yes. Our writers are familiar with Australia's university systems, citation styles, and marking conventions. You'll get a paper that meets your institution's exact expectations.
What citation styles do you support for Australia?
We support all major citation styles required by Australia universities, including APA 7th, Harvard, Chicago/Turabian, MLA, OSCOLA, Vancouver, and IEEE.
Can you write just one chapter of my dissertation?
Yes. We write individual dissertation chapters β literature reviews, methodology, data analysis, introductions, conclusions β or the full manuscript from proposal to defence-ready submission.